IntEx Construction Company
All Projects

West Walnut Foundation Repair

We installed a temporary beam beneath the balcony, repoured the rear wall foundation, rebuilt the wall, and renovated the balcony above.

Three white-trimmed windows sit below the balcony, with green shingle siding and exposed framing at the base of the rear wall.
Before
The finished rear elevation has white siding, a bank of three windows, and a white balcony railing.
After
Beside the rear entry, an opening beneath the shingles reveals wood framing and pink insulation.
Exposed framing beside the rear entry
The original rear windows and exposed lower wall sit below the second-floor balcony.
Existing rear wall
A temporary wood beam and braced posts stand in front of the rear wall beneath the balcony.
Temporary beam beneath the balcony
Fresh concrete fills a wood form along the base of the exposed rear wall.
New concrete foundation
With the rear wall removed, the new foundation is visible below a wide opening covered in clear plastic.
Rear wall removed
Three windows sit in the rebuilt rear wall, with green exterior sheathing still visible.
Rebuilt wall and windows
The balcony edge, upright framing, and underside of the roof are visible above the rebuilt wall.
Balcony framing